Friday, January 19, 2007
Studio Build - Tape and Texture
The crew who did the taping and texturing of the walls finished this morning. The photo on the top shows a view of the studio where my worktable will be on that end. The bottom photo shows the end of the room where the computer wall will continue from the old art room. This is the end of the room where the wall has been removed and the studio flows into what will be the computer room but I can't show that well in the photo angles.
Now, all that needs to be done is to have the French doors installed and painted, the electrical to have a final hook-up and the air conditioning ducts to be hooked up. All of that is roughed in but not the final hook-up. Then, it is up to us to get the room painted and have the laminate flooring installed. We are going to try to select the flooring this afternoon so that will be ready when we are ready to have it installed. Then, the tough part of putting all of these rooms back together that have been demolished since early November.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment